주요사업 실적

MAJOR BUSINESS PERFORMANCE선박건조기술
및 시설 컨설팅


Consulting for Ship building technology & facility

Description Company Period Consultingtheme(Education/support/Consultation) Effect Unique device
Supply performance
1
Lay out Design Consulting
Orient 2008.11.
  • Gwangyang Shipyard Lay out design
  • New shipyard Architecture
2
Production Technology Innovation Consulting
Korea
Yanase
2009.01.01
~
2009.06.30
  • Innovation in production planning and production management
  • Improvement of production methods
  • Welding automation
  • H/Cover & Lashing Bridge Increased productivity : 20%
  • Welding automation rate25% ↑
  • both carriage 2ea
  • A-3 Cable4ea
3
Production technology Innovation consulting
Sungdo
Cranes
2009.03.01
~
2009.06.30
  • Welding automation
  • Innovation in manufacturing methods
  • Production plan and improvement of production management
  • Welding automation rate30% ↑
  • LeadTime reduction15%
4
FactoryLayout Design & Facilities Consulting
TKT
[TANKTEC]
2009.03.01
~
2009.04.30
  • FactoryLay out design
  • Facilitiesbest arrangement
  • FCAW Power Source[Twin] 20대
  • A-3 cable 40ea
5
Assembly a block of curves and production technology Consulting
India 2009.03.01
~
2009.04.30
  • CurvedBlockAssembly technologyeducation
  • S/BossBlock production Supply
  • Construction Technology of Block Construction education
6
AFTHalfship Shipbuilding consulting
India
BHARATI
Shipyard
2011.02.01
~
2011.10.30
  • Halfship Ring Block fabrication & shipbuilding technology education
  • AFT Half ship shipbuilding & technology education
7
Production technology Innovationconsulting
TKT 2008.12.01
~
2009.03.30
  • Pipefactory Increase production capacity
  • Cost reduction design/Improved steel yield
  • Factory 5S Activity
  • Welding automationLCA
  • design/Improved steel yield 80%=>90%(↑12.5%)
  • Increased productivity: 30%
  • L/Time reduce:70%
8
Productiontechnology Innovation and Yard Lay-out Improvement Consulting
Gayaheavy
industry
2009.01.01
~
2010.04.30
  • Innovation in production and production management
  • Production capacity improve plan
  • Improvement of assembly methods
  • Welding automation
  • Off-shore Project production Process standard
  • Increased productivity15%
  • 5S Settle independent activities
  • Weaving single multi carriage 6ea
  • Tandem carriage 4ea
9
Production technology Innovation & Off-shore Lay-out improvement
POSCO-Plentec
2-Factory
2009.04.01
~
2010.06.30
  • Welding automation
  • InnovationBlock Construction
  • Area Layout improvement
  • Production plan and improvement of production management
  • Increased productivity20%
  • L/Time reduce3일
10
Block Assembly technological innovation Consulting
Gwangsin Machine 2009.06.01
~
2009.12.30
  • Increase welding productivity
  • WorkingareaLay out improvement
  • Fittingstandard establishment
  • Improved welding automation: 60%
  • L/Time reduce: 3day
  • Weaving single multi carriage 2ea
  • Tandem carriage 13ea
  • bothcarriage2ea
11
Production technology Innovation consulting
Kyungwon Bending 2009.07.01
~
2009.12.30
  • Fitting &weldingautomation
  • Working Area Loss removal
  • Workmanship improvement
  • Grindingreduce : 90%=>40%
  • WPS establishment
  • welding automation: 40% improvement
  • Tandem carriage 2ea
12
Production innovation and Welding automation Consulting
Hyundai
Mipo
shipyard
2009.09.01
~
2009.12.30
  • improvement of transportation
  • Increase assembly productivity
  • Welding automation
  • WorkingareaLay out improvement
  • Steel inventory reduction: 40%
  • L/Time reduce: 8일=>5일
  • Normalize workforce: 2명
  • WPS establishment
  • Line Speed level up: 50%
13
H/Cover manufacturing techniquesInnovation consulting
HUKSIN
H/Cover
2009.09.01
~
2010.01.30
  • Subassemblywelding automation,area improvement
  • Plate+longiautomation
  • Systematization of steel screening
  • Middle assembly welding automation
  • Subassembly productivity 20% ↑
  • Steelcutting7% ↑
  • Welding productivity30% ↑
  • Grinding30% ↓
  • Utility30% ↓
14
Production plan and product innovation Consulting
CHINA/GLS 2012.
~
in progress
  • Logistics innovation and overall productivity Improvement
15
Production plan and product innovation Consulting
CHINA/SSI 2012.
~
in progress
  • Logistics innovation and overall productivity Improvement
16
ship building technical transfer
India/
PIPAVAV Shipyard
2011.02.21
~
2012.04.30
  • 74.5k B/C& OSV shipbuilding
  • FacilitiesUp grading & shipbuilding Technology
  • On-site dispatch Technical transfer/education [3 persons]
  • Mini SAW 8SET
  • Toolsset
  • BothCarriage 5set
  • Back heatingcarriage 1set
  • SAW 8set
  • Portable Bevel M/C(15A~80A) 2set
  • Pipe Turning M/C 3set --Semi-Auto pipe branch hole cutting4set
17
Innovation in production technology
KEPPEL
SINGAPORE
2year
  • Increased productivity
  • High Efficiency Shipbuilding Technology
  • Production management technology
  • Accuracy management technology
  • High efficiency welding Technology
  • Increased productivity: 20%
  • Cost down: 10%
  • L/Timereduce: 2month
18
ship building Technical transfer
KEPPEL
USA
5year
  • High Efficiency Shipbuilding Technology
  • Production management technology
  • Accuracy management technology
  • High efficiency welding technology
  • Expert Dispatch OJT
  • Design of Production Management System
  • Production Function Training: 500person
  • Production technology transfer: 50person
  • Two mid-size shipbuilding of the year