사업소개

Export of Ship equipment, Manufactured items and materials조선.해양 장비,
제작품목 및 자재 수출


Pipe spool & Steel Outfitting

Pipe spool & Steel Outfitting
Pipe spool & Steel Outfitting
Pipe spool & Steel Outfitting

Steel Outfitting

C/Tank Traffic
Fore Mast
Fore Mast
C/Tank Traffic
Vent Riser Mast
Vent Riser Mast
AL louver vent
AL louver vent
Handrail
Handrail
Platform
Platform

Pipe spool

Deck Unit Assembly
Deck Unit Assembly
Pipe Spool Marking
Pipe Spool Marking
H/Coil Assembly
H/Coil Assembly
Module Unit
Module Unit
INSHOP Factory INSHOP Factory
INSHOP Factory

Pipe Spool Equipment & performance

[ Equipment ]
Division Equipment Spec’ Q’TY
Cutting
Equipment
Jig SAW M/C 15A~100A 2
Bend SAW 800A 2
Gas Cutt’g M/C 1000A 2
Coster M/C 1000A 2
Plasma Cutt’g M/C 500A 1
Processing
Equipment
Pipe beveling M/C US40 2
CNC Facing M/C 800A 1
Small Facing M/C 150A 1
Division Equipment Spec’ Q’TY
Welding
Equipment
Rotator M/C 50A~1000A 30
Tig welders M/C 300A 50
Co2 welders M/C 500A 50
Turning Roll 1500A 2
Molded
Equipment
Pipe Bending 15A~65A 1
Pipe Bending 80A~150A 2
[ Actual PC’S ]
2016 year 2017 year 2018 year Remark
Pipe spool Total 142,361 100,849 150,616
AVG/month 11,863 8,404 12,551

Piping distribution system operating

Piping distribution system operating
Piping distribution system operating
배관제작 관리 시스템

배관제작 관리 시스템

수주관리
  • 자재견적등록
  • 자재견적조회
  • 수주등록
  • 수주진행조회
  • 수주총괄조최
  • 수주진행필터링
배관품관리
  • 배관품수신
  • PIECE 자재등록
  • PIECE 정보조회
  • 도면/자재일괄조회
  • 추가도면수정관리
  • 자재조회/견적전송
작업지시
  • 작업지시도면출력
  • 작업지시등록
  • 작업지시조회
  • 원자재구매등록
  • 원자재구매조회
작업실적
  • 생산공정모니터링
  • 일일생산실적조회
  • 1차선별등록
  • 납품대기등록
  • E-COP실적전송
작업현황
  • 기간별제작조회
  • 기간별납품조회
  • 후처리실적조회
  • 납품대기조회
  • 미제작조회
  • 월별수주/제작조회
  • 월별납품조회
  • PIECE변경조회
  • 기성추이조회
  • 기성상세조회
  • 제작사기성조회
  • 제작사상세조회
  • 월별수주/제작조회
  • 월별납품/기성조회
  • 제작사별기성조회
  • 수주진행조회
  • 일일생산실적조회
  • 월별제작종합
  • 제작사별제작종합

Automatic Shop Primer Removal Machine for profile

(Hyundai Mipo Dockyard & Hyundai Heavy Industries)

Automatic Shop Primer Removal Machine for profile
Automatic Shop Primer Removal Machine for profile Automatic Shop Primer Removal Machine for profile

Calculation, design & fabrication for Half-ship on-sea joining system

  • 1
    Watertight cofferdam
  • 2
    Hydraulic guide
  • 3
    Alignment
  • 4
    Escape passage
  • 5
    Ship draft and Buoyancy analysis
  • 6
    Ship strength analysis
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system
Calculation, design & fabrication for Half-ship on-sea joining system

Bucket Wheel Reclaimer Production Design

(Two (2) of KOSTEC engineers have experience shop drawing work for one Bucket wheel boom reclaimer)

  • 1
    The project owner: Korea East-West Power Co., Ltd.
  • 2
    Main contractor: Hanjin Heavy industries!
  • 3
    Year: 2006
  • 4
    Location: Danjin Thermal Power Plant Unit No. 7 & * (500MWx2) in the Republic of Korea
  • 5
    Performed works of the engineers in previous company: Production DWG of Bucket wheel Reclaimer & Booms.
Bucket Wheel Reclaimer Production Design
Bucket Wheel Reclaimer Production Design
Bucket Wheel Reclaimer Production Design
Bucket Wheel Reclaimer Production Design